For the canton of Wallis, Blumer Lehmann has expanded and modernized the winter service facility in Sion in collaboration with Pini Groupe SA. The facility was specifically designed for the storage and processing of de-icing salt and brine, enabling efficient supply for the region's winter service.
With a total capacity of three silos of 400 cubic meters each and a height of 18.38 meters, the storage facility provides ample capacity to ensure a continuous supply even in severe winters. The silos are equipped with comprehensive conveying and measuring systems to ensure optimal storage and management of the salt. In addition to the silos, an additional brine tank with a capacity of 30 cubic meters was installed to complete the system and ensure rapid availability of brine.
The technical equipment of the facility includes modern conveying systems as well as recirculating and piping systems specifically designed for the handling and distribution of salt. Precise measuring and weighing equipment ensures that storage quantities and weights are constantly monitored. The roof platform, made of hot-dip galvanized steel, and an automated salt manager contribute to efficient, automated logistics that meet the demands of daily operations.
With the conscious choice of sustainable materials such as wood and galvanized steel, this project exemplifies Blumer Lehmann's commitment to innovation and environmental awareness. The salt storage facility combines traditional construction methods with state-of-the-art technology, ensuring that the winter service in the canton of Wallis can rely on a powerful and sustainable infrastructure.