Multipurpose building for two locations
Dudelange, LU
The outer shape of the building resulted from the intersection of the two sites.
The multifunctional building was planned with a strong focus on sustainability in the construction method and in the use of materials.
The entrance is next to the foyer, which plays an important role. It connects the multifunctional hall with the access to the outside space and with the kitchen.
The multi-purpose building will serve local clubs in the city centre for 8 years.
The wooden modules and elements were prefabricated in our production hall in Grossenlüder.
The outer form of the building resulted from the merging of the two locations.
After use, the building will be rebuilt in the 'Nei Schmelz' district.
The multifunctional building includes rooms such as a hall, kitchen, offices and a covered outdoor area.