Stedi, Ermatingen
Ermatingen, CH
![Stedi shelter at the wharf in Ermatingen on Lake Constance Stedi shelter at the wharf in Ermatingen on Lake Constance](/.imaging/mte/default-theme/resize-width-6/dam/Holzbau/Bilder/Referenzen/wartehaeuschen-stedi-ermatingen/Warteh-uschen-Stedi-am-Bodensee-Blumer-Lehmann-Holzbau-Engineering.jpg/jcr:content/Warteh%C3%A4uschen-Stedi-am-Bodensee-Blumer-Lehmann-Holzbau-Engineering.jpg)
![Full view of the Stedi shelter at night Full view of the Stedi shelter at night](/.imaging/mte/default-theme/resize-width-8-ratio-0675/dam/Holzbau/Bilder/Referenzen/wartehaeuschen-stedi-ermatingen/Warteh-uschen-Stedi-erleuchtet-Nachtaufnahme-Blumer-Lehmann-Holzbau-Engineering.jpg/jcr:content/Warteh%C3%A4uschen-Stedi-erleuchtet-Nachtaufnahme-Blumer-Lehmann-Holzbau-Engineering.jpg)
The new Ermatingen shelter is reminiscent of a ship in appearance and construction.
![Brightly lit Stedi shelter on the Ermatingen wharf Brightly lit Stedi shelter on the Ermatingen wharf](/.imaging/mte/default-theme/resize-width-6/dam/Holzbau/Bilder/Referenzen/wartehaeuschen-stedi-ermatingen/Warteh-uschen-Stedi-Gesamtansicht-Blumer-Lehmann-Holzbau-Engineering.jpg/jcr:content/Warteh%C3%A4uschen-Stedi-Gesamtansicht-Blumer-Lehmann-Holzbau-Engineering.jpg)
The simple and high-quality structure of the shelter was quite tricky to plan.
![Night shot of the illuminated Stedi shelter. Night shot of the illuminated Stedi shelter.](/.imaging/mte/default-theme/resize-width-8-ratio-0675/dam/Holzbau/Bilder/Referenzen/wartehaeuschen-stedi-ermatingen/Warteh-uschen-Stedi-Nachtaufnahme-Blumer-Lehmann-Holzbau-Engineering.jpg/jcr:content/Warteh%C3%A4uschen-Stedi-Nachtaufnahme-Blumer-Lehmann-Holzbau-Engineering.jpg)
The Stedi shelter is the new highlight of the Ermatingen harbour.
![The timber roof is fitted precisely onto the Stedi shelter. The timber roof is fitted precisely onto the Stedi shelter.](/.imaging/mte/default-theme/resize-width-8-ratio-0675/dam/Holzbau/Bilder/Referenzen/wartehaeuschen-stedi-ermatingen/Warteh-uschen-Stedi-Dachmontage-Blumer-Lehmann-Holzbau-Engineering.jpg/jcr:content/Warteh%C3%A4uschen-Stedi-Dachmontage-Blumer-Lehmann-Holzbau-Engineering.jpg)
Mounting the roof on the shelter – precise preparation pays off.
![The roof of the shelter is delivered by truck. The roof of the shelter is delivered by truck.](/.imaging/mte/default-theme/resize-width-8-ratio-0675/dam/Holzbau/Bilder/Referenzen/wartehaeuschen-stedi-ermatingen/Warteh-uschen-Stedi-Anlieferung-Dach-Blumer-Lehmann-Holzbau-Engineering.jpg/jcr:content/Warteh%C3%A4uschen-Stedi-Anlieferung-Dach-Blumer-Lehmann-Holzbau-Engineering.jpg)
The shelter was prefabricated in full at the Erlenhof factory and delivered to Ermatingen by heavy haulage.
![The roof of the Stedi shelter in Ermatingen is installed. The roof of the Stedi shelter in Ermatingen is installed.](/.imaging/mte/default-theme/resize-width-6/dam/Holzbau/Bilder/Referenzen/wartehaeuschen-stedi-ermatingen/Warteh-uschen-Stedi-Montage-Blumer-Lehmann-Holzbau-Engineering.jpg/jcr:content/Warteh%C3%A4uschen-Stedi-Montage-Blumer-Lehmann-Holzbau-Engineering.jpg)
Thanks to assembly templates and precision production of the steel supports, the roof was very easy to install.