Temporary constructions in Baden, Wohlen and Aargau

The three sports halls at the Baden, Wohlen and Aarau sites were commissioned as part of a tendering process and built in two stages. The sports halls are prefabricated, with the intention being to provide the three schools with the temporary space they require. Although these are temporary structures, the requirements in terms of building services, building physics, noise and acoustics were identical to those for permanent buildings. The hall’s roof structure consists of roof trusses resting on supports. The supports are integrated into the wall panels to comply with the construction requirements of the Swiss Federal Office of Sport, BASPO (flush walls with no protruding structural elements).

Portrait Migga Hug Head of GC Services Blumer Lehmann

Migga Hug

Head of GC & TC Services | Architectural planning | Switzerland
Member of the Division Management

+41 71 388 58 23
migga.hug@blumer-lehmann.com
From basketball to football or other sports, pupils can burn off energy in the sports hall.

Temporary prefabricated construction

The changing rooms offer sufficient storage space for bags and shoes.

View backstage